Out of stock

AP10317232050

Men's long lead ultra-light cotton socks with multicoloured stripes

$48.24

-28%

$34.73
Duties and shipping cost excl.

Size

Description

Men's long socks made in Italy from ultra-light stretch cotton. Very soft and designed to adapt perfectly to any look. The iconic multicoloured stripe pattern and shades of lead make these socks instantly recognisable. The embroidered Gallo brand logo at the toe provides contrast.

Technical description

Long lead socks with multicoloured stripes

Composition

77% Cotton 20% Polyamide 3% Elastane

Max washing temperature 40°C. Standard wash
Do not use bleach
Can be dry cleaned
Do not iron
Do not tumble dry

Shipments: The products will be shipped in 1/2 working days, delivery times may vary for countries outside the European Union.

 

Returns: The withdrawal right can be exercised within 14 working days from the goods delivery.

For more information, please visit our dedicated sections: Shipments  and Returns & Refunds .

NEED HELP?

We are at your disposal with a tailored customer care service. For any information on your online purchases you may need, please visit our FAQ  section.